Get Quote

Changzhou LongWen Drying & Refrigeration Co., Ltd.

Is it difficult for installation of Cold Room

2017 02/14

1) Installing by the user: we will test and install the machine before the shipment, all necessary spare parts, operation manual and CD are provided to guide the installation.

2) Installing by our engineers:

We can send our engineer to assist the installation and provide technical support and train your workers. The end-user should provide accommodation and round-trip ticket for our engineer.

Before our engineers` arrival, the installation place, electricity, water and installation tools should be prepared. Meanwhile, we will provide you a Tool List with the machine when delivery.

All spare parts are provided according to our standard. During installation period, any shortage of parts due to the actual installation site, the buyer is required to afford the cost, such as water pipes.

Any delay due to customer`s reason, it will be charged from the 4th day, USD100/day for one person as installation fee. Free of charge for one week.

Browse by: All Products | China Suppliers Service is provided by Bossgoo.com

Copyright © 2008-2024 Bossgoo Co., Ltd. All rights reserved.

Your use of this website constitutes acknowledgement and acceptance of our Terms & Conditions